Engineering Geology in the Design and Construction of Earthworks for Transport Infrastructure and Building Developments in the UK front cover

Engineering Geology in the Design and Construction of Earthworks for Transport Infrastructure and Building Developments in the UK

Product code: GIP002

Print publication date: 18/11/2026

Geological Society of London, GSL Geoscience in Practice, Engineering Geology, New

Binding: Paperback

ISBN: 9781786207005

Author/Edited by: Edited by John Perry, Vicky Corcoran, Alison Graham, Steve Phipps and Sam Boden

Weight: 1.04kg

Number of pages: 280

£65.00

Log in for your member price
Create an account

Full Description

The geographical spread of UK earthworks and the diversity of geology result in a wide range of materials being excavated or filled to construct these earthworks. Therefore, the design and construction of these frequent structures require considerable knowledge of material properties and behaviours. This book is intended to give a ‘to hand’ routine accessible reference to cover these points. The book covers new build earthworks only, principally rail, road and building developments. The six chapters take the reader from design fundamentals to implementation, and the strategy and controls for construction. A collection of case histories is presented and key points to takeaway are highlighted. 

United Kingdom geology and good practice are the main foci of the information and knowledge contained in the book although the technical principles described are used in most parts of the world so this book can be seen in that international context.  

This book is written for practising engineering geologists, geotechnical engineers and materials engineers.

Share:

List of worked examples

Guide to major tables and figures

Author biographies

Caption to cover image

Introduction to Engineering geology in the design and construction of earthworks for transport infrastructure and building developments in the UK John Perry

Acknowledgements

Chapter 1. The fundamentals of design, and the exploration and planning requirements, for different types of earthworks Vicky Corcoran and John Perry
1.1    Introduction
1.2    Sustainability and carbon footprint
1.3    Alignment, earthwork types and general construction aspects
1.3.1    Alignment
1.3.2    Embankments (engineered fill)
1.3.3    Cuttings (sources of fill and can be environmentally attractive)
1.3.4    Sidelong ground
1.3.5    Environmental bunding and landscaping
1.3.6    Borrow pits or soil swap areas
1.3.7    Exporting surplus materials
1.3.8    Haul
1.4     Development and use of the DMRB and MCHW
1.4.1    Broad classification
1.4.2    Classes
1.5    Exploration as the initial stage to design and the classification of earthworks materials
1.5.1    Soil type
1.5.2    Fine soils
1.5.3    Coarse soils
1.6    Location in the UK of geological materials that can be classified as cohesive and granular fills
1.6.1    Superficial deposits
1.6.2    Bedrock
1.7    Site investigation and management of geological data
1.7.1    Desk study
1.7.2    Ground investigation for design
1.7.3    Exploratory hole techniques
1.7.4    Geotechnical data management
1.8    Earthworks planning process
1.9    Frequently asked questions
1.10    Concluding remarks

Chapter 2. Construction (Design and Management) and Design implementation for construction Alison Graham and John Perry
2.1    Introduction
2.2    Construction (Design and Management) (CDM) Regulations for earthworks
2.2.1    Why we need CDM 2015
2.2.2    Key roles
2.2.3    Managing risk
2.2.4    Earthworks hazards
2.2.5    Life cycle of an earthwork
2.2.6    Communication of risks
2.3    Ground models
2.3.1    Information
2.3.2    Number of models or design ground sections
2.3.3    Key concepts
2.4    Design principles
2.4.1    Embankments
2.4.2    Cuttings
2.4.3    Sidelong ground
2.4.4    Slope stability analysis
2.5    Designing for construction and maximizing the use of materials
2.5.1    Environmental considerations
2.5.2    Preliminary design at the planning stage
2.5.3    Ground condition assessment for detailed design
2.5.4    Fill material considerations
2.5.5    Design considerations
2.5.6    Challenges of moisture and soft ground
2.5.7    Limited space and reinforced slopes
2.5.8    Unacceptable material and balancing deficits
2.6    Earthworks contract documents, standards, guidance and advice
2.6.1    Description
2.6.2    Completing contract specifications
2.6.3    Compaction specification
2.7    Frequently asked questions
2.8    Concluding remarks

Chapter 3. Establishing an earthworks strategy and construction controls Steve Phipps and Sam Boden
3.1    Introduction
3.2    Assessment of site investigation data to classify materials
3.2.1    Navigating a Ground Investigation Factual Report
3.2.2    Sampling and testing
3.2.3    Guidance on interpreting ground investigation test results for material acceptability
3.2.4    Using logs and soil descriptions to inform acceptability Soil descriptions
3.2.5    Water strikes
3.2.6    Made ground
3.2.7    Sulfur
3.2.8    Assessing rock strata
3.2.9    Distribution of material properties and assessing acceptability
3.2.10    Earthworks schedules
3.2.11    Bulking and yield
3.3    Establishing an earthworks strategy
3.3.1    Deficit v. surplus
3.3.2    Reuse hierarchy of materials
3.3.3    The influence of geology and geography
3.3.4    Understanding restraints
3.3.5    Site recycling: value of materials
3.3.6    Links between earthworks and other strategies
3.3.7    Processing of minerals from earthworks
3.3.8    Mass haul plan
3.3.9    Earthworks construction plant
3.3.10    Field trials
3.4    Understanding construction test methods
3.4.1    Particle size distribution (PSD), also referred to as a grading
3.4.2    Moisture content (MC) or water content (w)
3.4.3    Particle density (ρs)
3.4.4    Optimum moisture content (OMC) and maximum dry density (MDD)
3.4.5    Atterberg limits: plastic limit (PL), liquid limit (LL) and plasticity index (PI)
3.4.6    Moisture condition value (MCV)
3.4.7    California bearing ratio (CBR)
3.4.8    Consolidated and unconsolidated tests (triaxial apparatus) for cohesive materials
3.4.9    Consolidated direct shear test (shear box apparatus) for granular materials
3.4.10    Permeability testing
3.4.11    Los Angeles (LA) abrasion test
3.4.12    Recycled aggregate test
3.4.13    Sulfur testing
3.4.14    Electrochemical tests
3.4.15    Contamination testing
3.4.16    Hand shear vane (HSV)
3.4.17    MEXE probe
3.4.18    Nuclear density gauge (NDG)
3.4.19    Core cutters
3.4.20    Sand replacement test
3.4.21    Static plate load test
3.4.22    Light weight deflectometer (LWD)
3.4.23    Dynamic cone penetrometer (DCP)
3.4.24    Test frequencies: approval and routine control
3.5    Construction control by class
3.5.1    Class 1 (general granular earthworks fill)
3.5.2    Class 2 (general cohesive earthworks fill)
3.5.3    Class 3 (general chalk earthworks fill)
3.5.4    Class 4 (landscape earthworks fill)
3.5.5    Class 5 (topsoil)
3.5.6    Class 6 (selected granular earthworks fill and capping)
3.5.7    Class 7 (selected cohesive earthworks fill and capping)
3.5.8    Class 8 (miscellaneous earthworks fill)
3.5.9    Class 9 (stabilized capping materials)
3.6    Typical details showing fill applications
3.7    Managing the variability of materials during construction
3.7.1    General granular earthworks fill
3.7.2    General cohesive earthworks fill
3.7.3    Controlling compaction
3.7.4    Compliance monitoring
3.7.5    Some essential resource and overarching controls and considerations
3.8    Frequently asked questions
3.9    Concluding remarks

Chapter 4. Planning and managing risks and opportunities Steve Phipps and Sam Boden
4.1    Introduction
4.2    Safety risks
4.2.1 Geology and ground conditions
4.2.2 Plant operation
4.3    Planning for environmental risks
4.3.1 Wildlife and invasive non-native plant species plants (INNS)
4.3.2 Managing the impacts of water and adverse weather conditions
4.3.3 Managing other emissions
4.3.4 Environmental assessment for material reuse
4.3.5 Waste characterization
4.3.6 Asbestos
4.3.7 Waste acceptance
4.3.8 Landfill tax
4.3.9 Treatment and reuse frameworks
4.3.10 Waste Framework Directive (WFD)
4.3.11 Definition of waste and Materials Management Plan
4.3.12 Permitting
4.3.13 Exemptions
4.3.14 WRAP Quality Protocol – aggregates from inert waste
4.3.15 Regulatory Position Statements for aggregates
4.3.16    nexpected changes to ground conditions
4.4    Soil improvement and stabilization
4.4.1 Methodology
4.4.2 Improvement and stabilization
4.4.3 Binder types available and their use
4.4.4 Mixing plant
4.4.5 Factors affecting the strength of stabilized soil
4.4.6 Sulfur risks and controls
4.4.7 Moisture conditioning
4.4.8 Mellowing period
4.4.9 The process of soil stabilization
4.4.10 Characterization of the host material
4.4.11 Laboratory preparation methods
4.4.12 Site trials (or demonstration areas)
4.4.13 Site control
4.4.14 Applications
4.4.15 Best practice
4.5    Climate change effects
4.6    Frequently asked questions
4.7    Concluding remarks

Chapter 5. Case histories to illustrate earthworks design and construction John Perry, Vicky Corcoran, Steve Phipps and Sam Boden
5.1    Introduction
5.2    A14 Cambridge–Huntingdon (2015–22)
5.2.1    Geology
5.2.2    Earthworks design
5.2.3    Cut-fill balance
5.2.4    Borrow Pit 6
5.2.5    Refining the strategy
5.2.6    Conclusion
5.3    A38 Whitminster Roundabout Canal and Prison Copse Wall, Northleach, Gloucestershire
5.3.1 Ground model
5.3.2 Design
5.3.3 Construction
5.3.4 Conclusion
5.4    A34 Newbury Bypass
5.4.1 Introduction
5.4.2 Design and construction
5.4.3 Conclusion
5.5    M4 Junction 3–12 Smart Motorway
5.5.1 Introduction
5.5.2 Landscape re-design
5.5.3 Reuse of site-won cohesive fills within side road embankments
5.5.4 Reuse of site-won sand and gravel
5.5.5 On-site recycling
5.5.6 Prioritizing imported recycled aggregate over primary
5.5.7 Minimizing disposal of remaining soils
5.5.8 Conclusions
5.6    Norwich Northern Distributor Road (NNDR)
5.6.1 Introduction
5.6.2 Earthworks strategy
5.6.3 Pavement foundation design
5.6.4 Maximizing Class 6 recovery
5.6.5 Drainage
5.6.6 Conclusions
5.7    Aberdeen Western Peripheral Route (AWPR)
5.7.1 Introduction
5.7.2 Earthworks strategy
5.7.3 Design development
5.7.4 Construction plant and mass haul
5.7.5 Aggregates
5.7.6 Road pavement
5.7.7 Conclusions

Chapter 6. Key lessons to takeaway and realize John Perry

Index

 

The purchase of a print copy of a book from the online bookshop does not include access to the eBook. All items listed on the online bookshop are physical products dispatched from our warehouse in Bath, UK.

Ebook purchase: This title is available for purchase as an ePub file for personal use. Please see the eBooks page on the Lyell Collection for a list of available titles. The purchase of an eBook on the Lyell Collection site does not include a printed copy of the book. (Ebooks are not available as part of GSL member access or to institutional subscribers.) More information and help page for pay-per-view.